Below is a summary and explanation report's findings. Here's the actual report in 2 formats/sizes.:
(link to original (2003) comparative report)
There are two requirements to be fullfilled.
The new Fairfield school site has 20,000m2 of existing sports pitches at Boiling Wells, which Thomas More school has used for over 20 years. These will be upgraded and available for use, regardless of what other site is chosen to make up the remaining Govt. statuatory requirement. With a raised grass area, these pitches will fulfill 96.7% of the schools timetable needs onsite (p.18, 19) of the report).
To fulfill the remaining requirement, there would be a number of options, some of which we summarise below...